Our Projects

Foundation for CNC Equipment – Intermex / BUT

Design, engineering and construction of foundations for a 15,000 m2 CNC machining production line, Parque Industrial Roca, Monterrey, N.L.

Foundation for CNC Equipment – Intermex / BUT

Switch Installation 115 kV – Crisa

115 kV Switch Installation, testing and commissioning, Monterrey, N.L.

Switch Installation 115 kV – Crisa

115 kV / 5.5 MVA Power substation Construction – Hebel

Design, construction and commissioning of 115 kV / 5.5 MVA Power Station, Apodaca, N.L.

115 kV / 5.5 MVA Power substation Construction – Hebel

3.0 MVA Power Substation and Production Line Electrical Equipment Desing and Construction – Kuka Home

Design, construction and commissioning of 3.0 MVA Power Substation and Production Line Electrical Equipment, Prologis Industrial Park, Apodaca, N.L.

3.0 MVA Power Substation and Production Line Electrical Equipment Design and Construction – Kuka Home

12.5 MVA Power Substation Design and Construction

Design, construction and commissioning of 12.5 MVA Power Substation for Production Line, Hofusan Industrial Park, Salinas Victoria, N.L.

12.5 MVA Power Substation Design and Construction

Production Line Electrical Design and Construction 8.0 MVA

50,000 m2 Production Line Electrical Design and Construction, DAVISA Industrial Park, Apodaca N.L.

Production Line Electrical Design and Construction 8.0 MVA

×